Skip to main content
RP
ResiPlan

New Kinney Risk Assessment

Create a quantitative risk assessment using the Kinney method

Risk Assessment Details

Fill in the details to create a new Kinney risk assessment. The risk score will be calculated automatically based on Probability × Exposure × Consequence.

Hazard Assessment

Kinney method risk assessment for a specific hazard

Inherent Risk (Before Controls)

Assess the risk without considering existing controls

0.1=Almost impossible, 10=Certain

0.5=Rarely, 10=Continuous

1=Minor injury, 100=Multiple fatalities

Mesures de contrôle actuelles

Sélectionnez les mesures de contrôle des risques existantes selon la hiérarchie des contrôles (ISO 45001)

Hiérarchie des contrôles (du plus au moins efficace) :

5: Élimination4: Substitution3: Contrôles techniques2: Contrôles administratifs1: EPI

Residual Risk (After Controls)

Risk level after applying current controls

After controls applied

After controls applied

After controls applied

Recommended Actions

Additional measures to further reduce risk

Additional Information

ResiPlan - Next-generation business continuity platform